Coal Gasification Power Generation Project
Hargamesin, jualmesin, distributormesin, carimesin, AlatUji Laboratorium, mesinplastik, pengolahankaret, DaurUlang, Pertanian, Printing, Tekstil, karetLatex
Hargamesin, jualmesin, distributormesin, carimesin, AlatUji Laboratorium, mesinplastik, pengolahankaret, DaurUlang, Pertanian, Printing, Tekstil, karetLatex
WhatsApp
085222110091
WhatsApp
085277110091
  • Distributor Mesin Industri dan Alat Uji Laboratorium

ONE-STOP SOLUTION FOR YOUR INDUSTRY and LABORATORIES

Hargamesin, jualmesin, distributormesin, carimesin, AlatUji Laboratorium, mesinplastik, pengolahankaret, DaurUlang, Pertanian, Printing, Tekstil, karetLatex Coal Gasification Power Generation Project Coal Gasification Power Generation Project

Coal Gasification Power Generation Project

Coal gasification system (abbreviated as CGPS) is a kind of power generating system integrating coal gasification (coal gasifier) and purification (detarrer, desurfuration equipment) and coal gas power generating (coal gas engine). Waste heat boiler and steam turbine may also be chosen to make a gas-steam combined cycle power generating system. Coal is converted to low BTU coal gas. Sulfur content, nitrogen oxides, dust are removed in the coal gas purification section. The clean coal gas engine may be used by waste heat boiler to produce hot water or steam, which may be used by waste heat boiler to produce hot water or steam, which may be used in lithium bromide chiller.

 

Coal gasification power generating system is a promoting power generating system for its high power generating efficiency and good environmental characteristic. Efficient gas engine and clean coal gasification are combined in CGPS. Modulation is also adopted in CGPS, 500rpm-600rpm gas engine and Siemens generator are chosen in our gas gensets (400kw.500kw, 1000kw, 1200kw).

 

1.      Short project execution period. The power plant is normally started up within 5-6 months after contracting singing.

2.      Low investment (including equipment, land, civil, work and installation).

3.      Easy operation. CGPS maybe started or stopped any time. The switch time is very short.

4.      Low water consumption

Low operation and maintenance cost. Common technical workers are competent.

5.      Less contaminats. CGPS is more environmental friendly.

 

 

 

 

Pesan Sekarang
Order lewat Whatsapp
CONTACT US

SALES OFFICE ADDRESS
Kawasan Perkantoran Metro Indah Mall blok D-35
Jalan Soekarno Hatta Bypass Area
BANDUNG City - JAWA BARAT Province – INDONESIA
 
PHONE
OFFICE : 022.7536349 (HOTLINE)
SALES : 0852.22.110091 / 0852.77.110091
E-PROC / PENGADAAN : 0852.11222.091
TECHNICAL / OPERATIONAL : 0852.118000.91

 

PROCUREMENT (PENGADAAN) :
eproc@valtekindo.co.id
 

CUSTOMER SERVICE & AFTER SALE SERVICE :
cs@valtekindo.co.id
 

SALES & TECHNICAL DEPARTMENT :
sales@valtekindo.co.id
 


 

©2020 PT.VALTEKINDO GLOBAL INTERTEK All right reserved   Developed by javwebnet